Labour Cost Estimator

Work out construction labour three ways: by work item at piece rates, by crew at daily wages, or for a whole house per sq.ft. See the total, man-days, contractor margin and GST, and where the money goes.

Updated Rates reviewed September 2026

Built by Bhavin Sheth Runs in your browser, no sign-up

1. How is the labour paid? Town rates

Piece rates: enter the quantity of each work; the rate fills in for your location and can be changed.

2. Contractor and tax

Add a margin when a contractor supplies the crew; leave 0 when you pay workers directly.

1Breakdown

Where the labour money goes

Cost and man-days for each item, before margin and GST.

ItemBasisCostMan-daysShare
Excavation60 cum × ₹250₹15,000234%
PCC6 cum × ₹900₹5,40081%
RCC with shuttering and steel25 cum × ₹3,000₹75,00011319%
Brickwork45 cum × ₹1,500₹67,50010117%
Plaster3,500 sq.ft. × ₹22₹77,00011619%
Tiling, floor and wall1,100 sq.ft. × ₹40₹44,0006611%
Putty and painting3,000 sq.ft. × ₹18₹54,0008113%
Waterproofing300 sq.ft. × ₹20₹6,00091%
Plumbing points20 point × ₹1,200₹24,000366%
Electrical points60 point × ₹600₹36,000549%
Labour total₹4,03,900606100%

2Reference

Typical labour rates by location

Planning figures used by this calculator. Wages change every season and differ between states, so confirm with local contractors.

Daily wageVillageSmall townTownCityMetro
Mason₹770₹840₹900₹1,010₹1,150
Helper₹470₹510₹550₹620₹700
Carpenter (shuttering)₹810₹880₹950₹1,060₹1,220
Bar bender₹720₹790₹850₹950₹1,090
Plumber₹770₹840₹900₹1,010₹1,150
Electrician₹770₹840₹900₹1,010₹1,150
Painter₹680₹740₹800₹900₹1,020
Tile fitter₹810₹880₹950₹1,060₹1,220
Welder or fabricator₹770₹840₹900₹1,010₹1,150
Piece rateUnitVillageSmall townTownCityMetro
Excavationcum₹210₹230₹250₹280₹320
PCCcum₹770₹840₹900₹1,010₹1,150
RCC with shuttering and steelcum₹2,550₹2,790₹3,000₹3,360₹3,840
Brickworkcum₹1,280₹1,400₹1,500₹1,680₹1,920
Plastersq.ft.₹19₹20₹22₹25₹28
Tiling, floor and wallsq.ft.₹34₹37₹40₹45₹51
Putty and paintingsq.ft.₹15₹17₹18₹20₹23
Waterproofingsq.ft.₹17₹19₹20₹22₹26
False ceilingsq.ft.₹30₹33₹35₹39₹45
Plumbing pointspoint₹1,020₹1,120₹1,200₹1,340₹1,540
Electrical pointspoint₹510₹560₹600₹670₹770
House theka, civil onlysq.ft.₹240₹260₹280₹310₹360
House theka, with tiling and paintingsq.ft.₹320₹350₹380₹430₹490
House theka, completesq.ft.₹380₹420₹450₹500₹580

3Choose

Daily wage, piece rate or theka: how should you pay?

The way you pay changes who carries the risk of slow work, extra work and wastage.

Daily wage (hajri)

Workers × days × wage

Good for: small repairs, unclear scope, work you can supervise every day.

Watch: slow progress costs you, not the worker.

Piece rate

Per sq.ft., cum or point

Good for: plaster, brickwork, tiling, painting and wiring, where work is easy to measure.

Watch: agree how openings and wastage are measured before starting.

Theka (labour contract)

Per sq.ft. of built-up area

Good for: a whole house with one responsible contractor.

Watch: scope gaps become extra bills; write down what is included.

Turnkey (with material)

Labour and material together

Good for: owners who cannot supervise purchases.

Watch: specify brands and grades of every material in the contract.

ScopeList included and excluded work, room by room
MeasurementHow areas, openings and wastage are counted
Site facilitiesWho gives water, power, scaffolding, tools and shelter
PaymentsSmall advance, then stages tied to finished work
SafetyHelmets, harness for height work, first aid, insurance

Pay fair wages. Wages must not be below the state minimum wage for each category, and women and men doing the same work must be paid equally.

4Method

How the cost is worked out

Three methods, then margin and tax on top.

By work = quantity × piece rate for your location
By crew = workers × days × daily wage
Whole house = built-up area × floors × rate per sq.ft.
Man-days = crew: workers × days; others: cost ÷ average daily wage
Total = labour + margin + GST 18% if charged
  1. Location factor. Rates are set for a town and scaled: village 0.85, small town 0.93, city 1.12, metro 1.28.
  2. Average daily wage. A mason and two helpers per team, about ₹667 a day in a town, is used to turn cost into man-days.
  3. Stage split. For a whole house: foundation 15%, frame 30%, masonry and plaster 30%, finishing 25%.

5Scope

What this calculator does and does not do

Knowing the limits helps you compare quotes fairly.

It does

  • Price labour by work item, by crew or per sq.ft.
  • Fill typical rates for your location
  • Estimate man-days
  • Add contractor margin and GST
  • Give a summary, CSV, shareable link and print

It does not

  • Include materials, tools or machinery hire
  • Set legal minimum wages for your state
  • Plan the schedule or productivity of your site
  • Cover overtime, travel or food allowances
  • Know your local rates; change them to match quotes

6FAQ

Questions

What is the labour cost to build a house in India per sq.ft.?

Labour-only contracts (theka) for a house are commonly quoted per sq.ft. of built-up area. As a planning figure this calculator uses about ₹280 per sq.ft. for civil labour only, ₹380 with tiling and painting, and ₹450 including plumbing and electrical work, for a town, adjusted up for cities and down for villages. Local quotes can differ a lot.

What is the daily wage of a mason and a helper?

In a typical town the calculator uses about ₹900 a day for a mason and ₹550 for a helper, with cities higher and villages lower. Wages vary by state, season and skill; enter the rates your contractor quotes. State minimum wage notifications set the floor for each category.

Daily wage, piece rate or theka: which is better?

Daily wages suit small or uncertain jobs where you can supervise. Piece rates, such as per sq.ft. of plaster or per cum of brickwork, suit clear, measurable work. A theka per sq.ft. of built-up area is simplest for a whole house but needs a written scope, measurement method and payment stages.

What is a man-day?

One worker for one day. Ten workers for five days is fifty man-days. The calculator shows man-days so you can plan the crew and check a contractor's schedule.

Is GST charged on labour contracts?

Registered labour contractors usually charge GST on their bills. Use the GST switch if your contractor is registered; small unregistered contractors do not charge it. Confirm with your tax adviser.

What should be in a labour contract?

The scope of work and what is excluded, who provides water, electricity, scaffolding and tools, how work is measured, the rate, payment stages linked to completed work, the timeline, and who is responsible for safety and damage.

Does labour cost include materials?

No. This calculator is for labour only. Use the cement, brick, steel and paint calculators on this site for materials, or the house construction cost calculator for everything together.

Is my data stored?

No. The calculator runs in your browser and loads no third-party scripts. Inputs leave the page only if you copy the link, share on WhatsApp or download the list.