Cement Calculator

List the work, such as slabs, beams, columns, footings, plaster and floor beds, and get the cement bags, sand, aggregate and water for each and in total, with the cost. Or get a quick figure from your built-up area.

Updated Rates reviewed September 2026

Built by Bhavin Sheth Runs in your browser, no sign-up

1. What are you building? 24.99 cum concrete, 17.51 cum mortar

Lengths in feet or metres; thicknesses, widths and depths marked mm are in millimetres. Count multiplies the row, for example 12 columns.

2. Wastage and water

3. Rates Change to your local prices

1 cum = 35.3 cft; 1 brass = 100 cft. At ₹3,000 a cum, sand is about ₹85 a cft or ₹8,500 a brass.

1Breakdown

Where the cement goes

Cement, sand and aggregate for each item in your list.

WorkMix and volumeCement bagsSand cumAggregate cum
RCC slabM20 1:1.5:3, 8.71 cum70.33.667.32
RCC beamsM20 1:1.5:3, 3.47 cum28.01.462.91
RCC columnsM20 1:1.5:3, 2.52 cum20.41.062.12
FootingsM20 1:1.5:3, 8.03 cum64.83.376.74
PCC bedM7.5 1:4:8, 2.26 cum7.71.072.14
Brick mortar1:6 mortar, 8.01 cum43.99.13—
Plaster1:6 mortar, 4.46 cum24.45.08—
Plaster1:4 mortar, 2.25 cum17.22.39—
Floor bed1:4 mortar, 2.79 cum21.42.97—
Total with wastage30431.7022.29

2Grades

M20, M25 and other grades: what they mean

The number after M is the strength the concrete should reach after 28 days of curing, in N/mm² (newton per square millimetre). M20 means 20 N/mm². A higher grade needs more cement per cubic metre, so it costs more but carries more load and lasts longer in harsh conditions.

M7.5

1 : 4 : 8 · 7.5 N/mm²

Use for: lean PCC bed below footings and plinth beams, levelling courses.

Not for: anything with steel in it.

M10

1 : 3 : 6 · 10 N/mm²

Use for: PCC under floors, base for tiles and pavers, pathways.

Not for: slabs, beams or columns.

M15

1 : 2 : 4 · 15 N/mm²

Use for: plain concrete floors, ramps, steps and PCC in wetter conditions.

Not for: structural RCC members.

M20

1 : 1.5 : 3 · 20 N/mm²

Use for: RCC slabs, beams, columns and footings of houses in mild conditions. The usual minimum grade for RCC.

Watch: the highest grade normally made by nominal mix on site.

M25

1 : 1 : 2 · 25 N/mm²

Use for: RCC exposed to rain, soil or moisture, columns of taller buildings, water tanks.

Watch: better as a lab design mix or ready-mix; the 1:1:2 here is only a guide.

M30 and above

Design mix only

Use for: coastal and severe exposure, high-rise frames, bridges, heavy industrial floors.

Watch: not calculated here; mix proportions come from a lab design.

3Choose

How to pick the right grade and cement

Answer three questions: does the concrete have steel in it, how wet or harsh is its surrounding, and what do the structural drawings say. The drawings always win.

Bed below footings, levelling courseM7.5 or M10 PCC
Floor base under tiles, paths, stepsM10 or M15
House slabs, beams, columns, footings, dry inland siteM20
RCC in heavy rain, in contact with soil or water, taller buildingsM25, preferably design mix
Near the sea, chemical soil or water-retaining tanksM30 or more, design mix
Plaster and brick mortar1:4 for outer or thin walls, 1:6 for inner walls

OPC 53

Ordinary Portland Cement

Gains strength fastest; used for RCC where early formwork removal matters and in precast work. Needs good curing.

OPC 43

Ordinary Portland Cement

General purpose for RCC, plaster and masonry with steadier strength gain.

PPC

Portland Pozzolana Cement

Widely used for houses: plaster, masonry, foundations and RCC; slower early strength but good long-term durability.

PSC

Portland Slag Cement

Used for marine works, large foundations and mass concrete where resistance to chemical attack matters.

Follow your structural drawings. Indian practice under IS 456 allows nominal mixes only up to M20; for M25 and above, ask for a design mix or ready-mix concrete, and never reduce the grade your engineer specified to save cement.

4Reference

Mix ratios at a glance

Materials for one cubic metre of finished concrete or mortar, and for common plaster and floor jobs, before wastage.

MixUseCement bagsSand cumAggregate cum
M7.5 (1:4:8)PCC under footings, per cum3.40.470.95
M10 (1:3:6)PCC, floor base, per cum4.40.460.92
M15 (1:2:4)Light RCC, pathways, per cum6.30.440.88
M20 (1:1.5:3)Slabs, beams, columns, per cum8.10.420.84
M25 (1:1:2)Heavier RCC, per cum11.10.390.77
Mortar 1:3Per cum of mortar9.61.00—
Mortar 1:4Per cum of mortar7.71.06—
Mortar 1:5Per cum of mortar6.41.11—
Mortar 1:6Per cum of mortar5.51.14—
Plaster 12 mm, 1:6Per 100 sq.ft.0.610.127—
Plaster 20 mm, 1:4Per 100 sq.ft.1.420.198—
Floor bed 40 mm, 1:4Per 100 sq.ft.2.850.395—

5Method

How the quantities are worked out

The dry volume method used on Indian sites, applied to each row and added up.

Wet volume = count × length × width × thickness
Dry volume = wet × 1.54 for concrete, × 1.33 for mortar and plaster
Cement = dry × cement part ÷ total parts; bags = cum ÷ 0.0347
Sand = dry × sand part ÷ total parts
Aggregate = dry × aggregate part ÷ total parts
Water = cement kg × water-cement ratio
  1. Nominal mixes. M7.5 to M25 use nominal proportions by volume. For M25 and above, a lab design mix usually uses less cement for the same strength.
  2. Brick mortar. About a quarter of a traditional brick wall is mortar; the brick row uses that share. The brick quantity calculator works it out exactly.
  3. Plaster. Area × thickness, with the 1.33 factor covering joints and uneven walls.
  4. Steel is not deducted. Reinforcement takes 1 to 2% of concrete volume, which is within wastage.

6Scope

What this calculator does and does not do

Knowing the limits helps you add the right margin before you place an order.

It does

  • Work out cement, sand, aggregate and water for each item
  • Cover slabs, beams, columns, footings, PCC, brick mortar, plaster and floor beds
  • Use nominal mixes M7.5 to M25 and mortar mixes 1:3 to 1:6
  • Add wastage and price the materials
  • Give a quick figure from built-up area
  • Give an order list, CSV, shareable link and print

It does not

  • Design a concrete mix or account for admixtures
  • Replace the grade on your structural drawings
  • Include steel, shuttering, labour or curing
  • Price ready-mix concrete, pumping or transport
  • Know your local prices; change the rates to match your supplier

7FAQ

Questions

How many cement bags are needed for 1 cubic metre of concrete?

Using nominal mixes and a dry volume factor of 1.54, about 3.4 bags for M7.5 (1:4:8), 4.4 bags for M10 (1:3:6), 6.3 bags for M15 (1:2:4), 8.1 bags for M20 (1:1.5:3) and 11.1 bags for M25 (1:1:2). The table on this page lists sand and aggregate too.

How is cement quantity calculated?

Find the wet volume of the work: length × width × thickness. Convert it to dry volume by multiplying by 1.54 for concrete or 1.33 for mortar, because dry materials shrink when water is added and voids fill up. Cement volume = dry volume × cement parts ÷ total parts, and one 50 kg bag is about 0.0347 cum (cement weighs about 1,440 kg per cum).

How much cement is needed for plastering?

For 12 mm plaster in 1:6, about 0.6 bags per 100 sq.ft. (0.07 bags per sq.m). For 20 mm external plaster in 1:4, about 1.4 bags per 100 sq.ft. (0.15 bags per sq.m). Add a plaster row in the calculator with your wall area and thickness.

How many bags of cement are needed for a 1,000 sq.ft. house?

A common thumb rule for a complete RCC house is about 0.4 bags per sq.ft. of built-up area, so about 400 bags for 1,000 sq.ft. The From built-up area tab uses 0.35, 0.40 or 0.45 bags per sq.ft. by quality. For a firm order, list the actual work items in the Work by work tab.

What is the difference between M15, M20 and M25?

The number is the strength in N/mm² after 28 days. Nominal mixes give approximate proportions: M15 is 1:2:4, M20 is 1:1.5:3 and M25 is 1:1:2. Slabs, beams and columns in houses are usually M20 or higher; PCC under footings is often M7.5 or M10. For M25 and above, a design mix from a lab is recommended.

How much water is needed?

The calculator uses a water-cement ratio of 0.5 for concrete, which is about 25 litres per 50 kg bag. Your engineer may specify a lower ratio for stronger concrete. Mortar water is not shown because masons add it by workability.

What is a brass?

A brass is 100 cubic feet, about 2.83 cubic metres. Sand and aggregate are shown in cum, cft and brass so you can order in the unit your supplier uses.

Is my data stored?

No. The calculator runs in your browser and loads no third-party scripts. Inputs leave the page only if you copy the link, share on WhatsApp or download the list.